Direct Contact
EN PT

Footbridge at University of Minho

Infrastructure

Reinforced concrete structure, rest areas in prefabricated material, electrical installation in the footpath and tactile floor for the blind throughout the walkway route.

 

Customer:

University of Minho

Newsletter

Receive all the news in your mailbox

subscribe

By subscribing to the newsletter, you agree to the Privacy Policy.

© 2018 - 2020 CCR Group. All rights reserved.

Privacy Policy