Intercetor System renovation and expansion

Infrastructure

The building aims to end the lack of capacity of the existing system.

The project involves the construction of three major works:

  • Lift station construction with a depth of 10m with 4 floors, holding tanks, flow channels, engine room and the emergency room. It also includes mechanical equipment and electrical infrastructure, which are an integral part of the building.
  • Gravity collector with depths of over 6m, linking the existing extension with the new equipment.
  • Lifting conduct in which we highlight the 160m development of this conduct, which will allow the interconnection of EE to the existing discharge collector.

 

Customer:

Póvoa de Varzim Municipality